Work on the Brewery
What we’ve accomplished so far
- Hired an architect and had Blue Prints drawn up
- Replaced the roof on the building
- Installed the Main Entrance
- Installed an overhead door
- Framed in interior walls
- Ran water to the building
- Installed water lines inside the building
- Installed a new Electrical Service Panel
- Installed electrical lines inside building
- Ran propane lines
- Installed heaters
- Installed hot water heater
- Insulated exterior walls and cooler
- put rough cut lumber on the walls
- Hired Civil Engineer to design a NYS DEC approved septic system
- Installed septic system
- Ran drain lines
- Installed sinks, commode and restroom door
- Built Brew-house and Fermentors